JV Concrete Solutions LLC
2026-08-14T20:16:26.907Z
We contracted with Cali to have a slab poured for a new shed. He quoted us on a Friday and had the job scheduled for and finished on the following Tuesday!! That seems unheard of by today’s standards where there is usually a lead time of 6-8 weeks.Unfortunately, we have a very sloped yard. However, that presented no problem for Cali and his team of three other men. The slab is absolutely level!!They arrived early, worked hard all day (it was VERY hot!), didn’t even leave the property for lunch, and worked well into the evening through a pop-up storm with a torrential downpour.They got the ENTIRE job (excavating, leveling, forming, pouring, floating the concrete, adding expansion joints) done in one day and even stayed through the storm to make sure the fresh concrete was protected until it had time to set a bit. They literally stood out in the pouring rain managing plastic sheets in the wind!!Cali and his crew even went above and beyond for us. He had some stone left over and rather than leave it in a pile for us, he used it to augment our old stone driveway. He also made our pour a bit larger than we requested, at no extra charge to us, to make sure there was extra width on the slab to accommodate the shed with a bit of “wiggle room” on the placement.The whole crew was efficient, very friendly, and left the construction site very clean. We couldn’t have expected a better experience with their work and we definitely will be using them again for some upcoming projects! Thank you, Cali and crew!